期刊論文
SW Chiu, CS Wu, CT Tseng
Operations Research Perspectives 6, 100115
2019
2.
CT Tseng, CH Lee, YSP Chiu, WT Lu
International Journal of Production Research 55 (11), 3149-3163
2017
3.
CT Tseng, CH Lee
The International Journal of Advanced Manufacturing Technology 89 (5), 1865-1874
2017
4.
YSP Chiu, HD Lin, CT Tseng, SW Chiu
International Journal for Engineering Modelling 29 (1-4), 27-36
2016
5.
An ambient intelligence system for water release scheduling in cascade hydropower systems
CT Tseng, YL Lee, CC Chou
Journal of Ambient Intelligence and Humanized Computing 6 (1), 47-55
2015
6.
Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach
SW Chiu, PC Sung, CT Tseng, YSP Chiu
NISCAIR-CSIR, India
2015
7.
Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy
SW Chiu, CT Tseng, MF Wu, PC Sung
Journal of applied research and technology 12 (3), 615-622
2014
8.
CT Tseng, MF Wu, HD Lin, YSP Chiu
Economic Modelling 36, 30-36
2014
9.
CT Tseng, KH Chen
Engineering Optimization 45 (12), 1431-1448
2013
10.
HY Lin, CJ Liao, CT Tseng
Journal of the Operational Research Society 62 (6), 949-959
2011
11.
A variable neighborhood search for the single machine total stepwise tardiness problem
CT Tseng, YC Chou, WY Chen
Proceedings of the 2010 International Conference on Engineering, Project and …
2010
12.
Minimizing total tardiness on a single machine with controllable processing times
CT Tseng, CJ Liao, KL Huang
Computers & Operations Research 36 (6), 1852-1858
2009
13.
A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain
CJ Liao, CC Shyu, CT Tseng
International Journal of Production Economics 117 (1), 127-135
2009
14.
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
CT Tseng, CJ Liao
European Journal of Operational Research 191 (2), 360-373
2008
15.
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
CT Tseng, CJ Liao
International journal of production research 46 (17), 4655-4670
2008
16.
A note on two-stage hybrid flowshop scheduling with missing operations
CT Tseng, CJ Liao, TX Liao
Computers & Industrial Engineering 54 (3), 695-704
2008
17.
A discrete version of particle swarm optimization for flowshop scheduling problems
CJ Liao, CT Tseng, P Luarn
Computers & Operations Research 34 (10), 3099-3111
2007
18.
A performance evaluation of permutation vs. non-permutation schedules in a flowshop
CJ Liao, LM Liao, CT Tseng
International Journal of Production Research 44 (20), 4297-4309
2006
歷年科技部計畫
96 變動臨域搜尋法應用於排程問題 97/1/1~98/7/31
98 混合式通用啟發法於排程問題之應用 98/8/1~99/7/31
100 考慮服務水準限制之非等效平行機排程問題 100/8/1~101/7/31
101 應用演化式計算於選擇權交易策略組合問題 101/8/1~102/7/31
102 易經最佳化演算法之研究 102/8/1~103/7/31
歷年科技部大專生學生研究計畫
97 階段式延遲成本最小化之單機排程問題
108 服務水準限制下平行機排程問題-以W公司為例
歷年校內研究計畫
99 混合式通用啟發法於排程問題之應用(II)
105 易經最佳化演算法應用於平行機排程問題
110 鯨魚最佳化演算法應用於人機協作排程問題