top of page

期刊論文

1.                                                                 

Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system

SW Chiu, CS Wu, CT Tseng

Operations Research Perspectives 6, 100115

2019

2.

A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision

CT Tseng, CH Lee, YSP Chiu, WT Lu

International Journal of Production Research 55 (11), 3149-3163

2017

3.

A new electromagnetism-like mechanism for identical parallel machine scheduling with family setup times

CT Tseng, CH Lee

The International Journal of Advanced Manufacturing Technology 89 (5), 1865-1874

2017

4.

Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach

YSP Chiu, HD Lin, CT Tseng, SW Chiu

International Journal for Engineering Modelling 29 (1-4), 27-36

2016

5.

An ambient intelligence system for water release scheduling in cascade hydropower systems

CT Tseng, YL Lee, CC Chou

Journal of Ambient Intelligence and Humanized Computing 6 (1), 47-55

2015

6.

Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach

SW Chiu, PC Sung, CT Tseng, YSP Chiu

NISCAIR-CSIR, India

2015

7.

Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy

SW Chiu, CT Tseng, MF Wu, PC Sung

Journal of applied research and technology 12 (3), 615-622

2014

8.

Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach

CT Tseng, MF Wu, HD Lin, YSP Chiu

Economic Modelling 36, 30-36

2014

9.

An electromagnetism-like mechanism for the single machine total stepwise tardiness problem with release dates

CT Tseng, KH Chen

Engineering Optimization 45 (12), 1431-1448

2013

10.

An application of variable neighbourhood search to hospital call scheduling of infant formula promotion

HY Lin, CJ Liao, CT Tseng

Journal of the Operational Research Society 62 (6), 949-959

2011

11.

A variable neighborhood search for the single machine total stepwise tardiness problem

CT Tseng, YC Chou, WY Chen

Proceedings of the 2010 International Conference on Engineering, Project and …

2010

12.

Minimizing total tardiness on a single machine with controllable processing times

CT Tseng, CJ Liao, KL Huang

Computers & Operations Research 36 (6), 1852-1858

2009

13.

A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain

CJ Liao, CC Shyu, CT Tseng

International Journal of Production Economics 117 (1), 127-135

2009

14.

A discrete particle swarm optimization for lot-streaming flowshop scheduling problem

CT Tseng, CJ Liao

European Journal of Operational Research 191 (2), 360-373

2008

15.

A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks

CT Tseng, CJ Liao

International journal of production research 46 (17), 4655-4670

2008

16.

A note on two-stage hybrid flowshop scheduling with missing operations

CT Tseng, CJ Liao, TX Liao

Computers & Industrial Engineering 54 (3), 695-704

2008

17.

A discrete version of particle swarm optimization for flowshop scheduling problems

CJ Liao, CT Tseng, P Luarn

Computers & Operations Research 34 (10), 3099-3111

2007

18.

A performance evaluation of permutation vs. non-permutation schedules in a flowshop

CJ Liao, LM Liao, CT Tseng

International Journal of Production Research 44 (20), 4297-4309

2006

歷年科技部計畫

96      變動臨域搜尋法應用於排程問題                              97/1/1~98/7/31

98      混合式通用啟發法於排程問題之應用                      98/8/1~99/7/31

100    考慮服務水準限制之非等效平行機排程問題         100/8/1~101/7/31

101    應用演化式計算於選擇權交易策略組合問題         101/8/1~102/7/31

102    易經最佳化演算法之研究                                        102/8/1~103/7/31

歷年科技部大專生學生研究計畫

97      階段式延遲成本最小化之單機排程問題

108    服務水準限制下平行機排程問題-以W公司為例       

歷年校內研究計畫

99      混合式通用啟發法於排程問題之應用(II)

105    易經最佳化演算法應用於平行機排程問題

110    鯨魚最佳化演算法應用於人機協作排程問題

​​​

bottom of page